Gantt Alabama Historical topographic map, 1:24000 scale, 7.5 X 7.5 Minute, Year 2011

~ Gantt AL topo map, 1:24000 scale, 7.5 X 7.5 Minute, Historical, 2011

  • $18.95
  • Save $6


Gantt, Alabama, USGS topographic map dated 2011.

Includes geographic coordinates (latitude and longitude). This topographic map is suitable for hiking, camping, and exploring, or framing it as a wall map.

Printed on-demand using high resolution imagery, on heavy weight and acid free paper, or alternatively on a variety of synthetic materials.

Topos available on paper, Waterproof, Poly, or Tyvek. Usually shipping rolled, unless combined with other folded maps in one order.


  • Product Number: USGS-5465970
  • Free digital map download (high-resolution, GeoPDF): Gantt, Alabama (file size: 29 MB)
  • Map Size: please refer to the dimensions of the GeoPDF map above
  • Weight (paper map): ca. 55 grams
  • Map Type: POD USGS Topographic Map
  • Map Series: US Topo
  • Map Verison: Historical
  • Cell ID: 16761
  • Datum: North American Datum of 1983
  • Map Projection: Transverse Mercator
  • Map Cell Name: Gantt
  • Grid size: 7.5 X 7.5 Minute
  • Date on map: 2011
  • Map Scale: 1:24000
  • Geographical region: Alabama, United States

Neighboring Maps:


All neighboring USGS topo maps are available for sale online at a variety of scales.


Spatial coverage:

Topo map Gantt, Alabama, covers the geographical area associated the following places:

- Coldwater - Straughn - Clearview - Rawls - Antioch - Dunns - Gantt - Valley of Shiloh - Boston - Searight

  • Map Area ID: AREA31.531.375-86.5-86.375
  • Northwest corner Lat/Long code: USGSNW31.5-86.5
  • Northeast corner Lat/Long code: USGSNE31.5-86.375
  • Southwest corner Lat/Long code: USGSSW31.375-86.5
  • Southeast corner Lat/Long code: USGSSE31.375-86.375
  • Northern map edge Latitude: 31.5
  • Southern map edge Latitude: 31.375
  • Western map edge Longitude: -86.5
  • Eastern map edge Longitude: -86.375

Related Maps